Partner Sign-Off and Final Archiving
The back half of the Quartyl workflow: the on-demand Word and PDF master report that produces Document Generated, the partner sign-off, and what the archive locks.
The back half of the workflow is three states and two decisions. The analysis is settled and the review is done; what remains is the firm’s formal document, the final sign-off, and the close-out – after which the study is a record, not a working object.
One naming note up front, because it trips people: there is no state called “Partner Sign Off”. The workflow runs In Review → Document Generated → Signed Off → Archived, and those are the labels the UI prints.
What lands in the state
The back half opens at Document Generated, and the study reaches it from In Review: the on-demand master-report build is the step that takes it there, and no manual step moves a study out of In Review on its own. The review phase before it moves no state at all — the Excel workbook is that phase’s deliverable, regenerated in place while the study stays In Review. So a study at Document Generated carries its workbook, its Word report (plus the PDF when that leg succeeded), and the move that matters from here is the partner’s sign-off.
The final document: what produces Document Generated
Generating the final document is an on-demand action. It is the partner’s action – Partner or Firm Admin – and it is what creates the next state:
- What it builds. The seven-chapter Word master report with its twelve annexures, plus the branded client-facing PDF, from one content stream – the two files cannot disagree on a figure or a chapter. The Word document is the primary artefact; the PDF leg is best-effort – if it fails, the Word document is still stored, the failure is recorded, and the PDF is simply absent. Treat a missing PDF as “no PDF available”, not as an error.
- What it collects first. The popup opens with the short lines the study already answers – comparable years, regions searched, the database the wizard selected – so you confirm them rather than compose them, and Reset puts the study’s answer back. So does the firm’s standing purpose of study and transaction description wording, with this study’s taxpayer, financial year and jurisdiction in it: you read and edit what you are about to sign, and Reset puts that wording back. The study-derived paragraphs (industry overview, the FAR narrative) open empty, which means “print what this study produces”, and their wording is offered on a button you can fill and restore; each also expands to a full-size editing window. What is left to type is what no study carries: prepared-by (the one required field), prepared-for, report date, the company overview, and the corporate-background schedules (group entities and shareholding).
- Where it reads from. The study’s stored results and configuration, merged with those engagement fields, with the reviewer’s effective verdicts applied. It is reproducible from the record.
- Where it is allowed. From In Review (the first build) or Document Generated (a rebuild) – the two states that mean the analysis has landed and its results are on the record. Anything earlier – Draft, Study Initialized, Processing – is refused with a message naming the step that comes first, because a document must not stand in for an analysis that has not finished, and a Rejected or Failed study is refused until it is re-submitted; from Signed Off or Archived it is refused outright, because the signer attested to a specific document. A study whose analysis never landed is refused the same way. Up to five builds per study; once that’s spent a further build is refused rather than silently starting.
- What it produces. The build runs in the background — you can follow its progress — and then attaches the Word document and, when it succeeded, the PDF to the study.
The document does touch the state machine – at one point. The In Review → Document Generated step is performed by this build, with its own audit entry, and it is the only forward step a build takes: the workbook is the review phase’s own deliverable and moves no state, and a study whose analysis has not landed in review is refused before a build starts. That is what keeps the ordering honest – sign-off needs Document Generated, and Document Generated needs a study whose results are settled in review, so no single click can stand in for either. Once a study is at Document Generated, a re-generation overwrites the files and leaves the workflow state exactly where it was; from Signed Off or Archived it is refused outright, because the attestation is to the document that was signed. So the document is not a side action on a settled study: producing Document Generated is its job, re-producing it is not.
The mechanics and the engagement fields are in Final Document Generation; the workbook’s own structure is in The Excel Report.
The sign-off decision
Sign-off is available only at Document Generated – before the formal document exists the action stays visible but disabled, reading Awaiting Document Generation, so the practice cannot sign off a study it has not yet documented and can see which step comes next. The decision belongs to Partner or Firm Admin.
- Sign off – Document Generated → Signed Off, a single audited transition: actor, role, timestamp, notes.
- Send back – not available from here. The reverse transitions the machine allows are In Review → Rejected and Processing → Draft, and nothing else. Once the document is built the study has left In Review, and there is no return leg: a change to the analysis means a new study with its own record, and a change to the deliverable means re-generating the document from the record as it stands. If a partner disagrees with the review, the decision had to be made at In Review, where the reject right also sits with the partner role.
A study that is already locked cannot be signed off or archived; the lock is the archive, and it is one-way.
Archiving: the close-out
Signing off makes the study ready; archiving closes it. The archive is the narrowest gate in the workflow: Partner only – checked ahead of the role lists, so a Firm Admin may sign a study off and may not archive it.
Archiving the study:
- Sets the lock – the study records who archived it and when. From that moment the study accepts no updates; an edit attempt is rejected, not silently ignored, and there is no way back out of Archived — it is the one terminal state.
- Is audited – the transition, the actor, the role and the timestamp join every other move in the study’s log.
What the archive preserves
| Preserved | What it is |
|---|---|
| The analysis data | The settled statistics, the tested party position, the conclusion, the pool counts – the run’s output as the review left it, including the recomputed figures after committed overrides |
| The comparable record | Every screened company with its verdict, its reason, and any reviewer override with its audit entry |
| The parameters | The PLI, the method, the years, the filters, the percentiles – the configuration the run executed |
| The report files | The Excel workbook, the Word master document and, where the best-effort leg succeeded, the branded PDF – on the study and in storage |
| The audit trail | Every transition, every workbook request, every edit, assignment, override and rejection – the chronology that explains the record |
One boundary worth knowing: the raw upload – the normalised source data behind the run – does not ride into the archive as a promise. A workbook build never reclaims it (every regeneration rebuilds from the same stored source, which is what keeps the review phase able to round again), and any copy still held is bounded by the firm’s own retention window (seven days by default, settable down to one day) measured from when the study entered review. Everything in the table above survives; the raw upload is not in the table. A rebuild that needs the raw data needs a re-run – which is the practical argument for generating the deliverables while the study is still in review, not months later.
FAQ
Can anything change after archiving? No. The archived study is immutable: no field edits, no overrides, no transitions. The record is final, and that finality is what the archive exists to provide – a changed study is a new study, with its own record.
Who can archive? Partner only. The Firm Admin carries the document and sign-off rights; the close-out is not among them.
Is the Word report generated automatically when the review is done? No – and that matters for sequencing. The Excel workbook is the review phase’s own deliverable: its first round is produced automatically when the analysis lands in review, and the reviewer regenerates it from there. The Word master report (and its PDF sibling) is an explicit, engagement-configured action, and until it has run the study is still In Review with no sign-off button.
Can the document be regenerated after sign-off? No. Sign-off is the attestation to a specific document, so Signed Off and Archived are not buildable states: the request is refused, and a build that slipped through anyway stops itself and stores nothing. The files already delivered stay on the record and downloadable, untouched.
What does the partner see before deciding? The settled results – range, tested party position, conclusion – the comparable record with its final verdicts and rationale, the workbook, and the generated document. The sign-off is made on the record, and the record is complete at this state.
See it working in your workspace
Sign in to run the steps above on a real study – or book a demo and we will walk the workflow end to end.
Related docs
Manager Review: Approving, Sending Back and Overriding
The In Review state in a Quartyl study: what the reviewer sees, the workbook rounds that make up the review, sending back with recorded reasons, and overriding verdicts.
Read docStudy Lifecycle: From Draft to Final Archive
The Quartyl study state machine end to end: the nine workflow states, which roles drive each transition, the review-phase workbook, and the rejected and failed recovery paths.
Read doc